Decorative LED Display
Decorative LED Displays for Sculptural Interiors
Freestanding and architectural LED objects that combine display technology with a decorative form.

Project approach
Developed around the interior, not selected from a generic catalogue.
- LED planters, vases, bottle forms and other custom sculptural display objects.
- A focal point for hospitality, retail launches and experiential interiors.
- Shape, scale, colour and display content are developed for the project brief.
Product demonstration
Product demonstration: LED planter display
A planter-form LED object developed around the approved shape, content and installation conditions.
Product footage from TextureLED's Shenzhen manufacturing and engineering team. Product configuration, installation route and scope are confirmed for each brief.
Suitable spaces
Technical reference
A clear starting point for the technical conversation.
The listed values are a planter-display reference configuration. Shape, protection level, weight and final electrical data vary by approved design.
These are planning references, not a fixed specification. Final pixel pitch, power, weight, mounting detail and applicable compliance documents are confirmed for the quoted configuration.
- Reference configuration
- P1.25 planter display
- Brightness
- ≥600 nits
- Refresh rate
- ≥3840 Hz
- Service route
- Front service, by approved design
- Ingress protection
- IP31 / IP43, by design
Design resources
Request the right project package.
Technical documents are prepared against the confirmed wall, viewing conditions and destination market.
Technical review
Configuration direction, drawings and service-route discussion.
Material samples
Discuss surface, edge and finish references for your interior.
Project assurance
Terms made clear before production.
2-year standard warranty
Covers manufacturing and hardware defects under the project warranty terms. Spare parts, replacement process and freight responsibility are confirmed in the quotation and contract.
Production and documents
Standard configurations typically enter production in 15–30 days. Custom structures, samples and special finishes are scheduled per project. Applicable CE, FCC and RoHS documents are supplied by configuration and destination market.
Factory testing before shipment
Each approved configuration follows aging and final inspection before shipment. Packing, spare-parts recommendations and the delivery route are confirmed against the project scope.