Texture LED Screen
Texture LED Screens for Architectural Interiors
A material-led LED surface developed around the language of stone, wood, metal and crafted interior finishes.

Project approach
Developed around the interior, not selected from a generic catalogue.
- Texture direction starts with the interior palette rather than a standard display cabinet.
- Designed for feature walls, reception zones and curated retail moments.
- Engineering route confirmed around wall dimensions, viewing distance and installation conditions.
Product demonstration
Product demonstration: P1.25 marble texture surface
A P1.25 marble-texture LED surface shown before installation. Material matching, final surface and module route are approved per project.
Product footage from TextureLED's Shenzhen manufacturing and engineering team. Product configuration, installation route and scope are confirmed for each brief.
Suitable spaces
Technical reference
A clear starting point for the technical conversation.
A final specification sheet is issued after viewing distance, wall structure and surface sample are approved.
These are planning references, not a fixed specification. Final pixel pitch, power, weight, mounting detail and applicable compliance documents are confirmed for the quoted configuration.
- Reference configuration
- P1.25 marble-texture LED surface
- Surface route
- COB or GOB selected by finish, viewing distance and budget
- Installation
- Wall route and service access confirmed before production
- Maintenance
- Front-service route available by project configuration
Design resources
Request the right project package.
Technical documents are prepared against the confirmed wall, viewing conditions and destination market.
Technical review
Configuration direction, drawings and service-route discussion.
Material samples
Discuss surface, edge and finish references for your interior.
Project assurance
Terms made clear before production.
2-year standard warranty
Covers manufacturing and hardware defects under the project warranty terms. Spare parts, replacement process and freight responsibility are confirmed in the quotation and contract.
Production and documents
Standard configurations typically enter production in 15–30 days. Custom structures, samples and special finishes are scheduled per project. Applicable CE, FCC and RoHS documents are supplied by configuration and destination market.
Factory testing before shipment
Each approved configuration follows aging and final inspection before shipment. Packing, spare-parts recommendations and the delivery route are confirmed against the project scope.